Factory License Registration

A factory license registration is a legal requirement for any industrial establishment to operate within a specific jurisdiction. It is mandated by government authorities to ensure compliance with safety, health, and environmental regulations. Obtaining a factory license involves submitting necessary documentation, such as building plans, safety measures, and environmental impact assessments, to the relevant regulatory bodies. Once approved, the license permits the factory to commence operations within the specified guidelines and periodic inspections may be conducted to ensure ongoing compliance. Failure to obtain or maintain a factory license can result in legal penalties and disruptions to business operations.

Factory License: An Overview For MSME's

A factory license is an important certification or authorization granted to MSME's or factories to commence manufacturing operations. The factory license registration process is governed by the Factory Act 1948 and issued by the local department of factories and boilers. It is used to regulate the safety conditions of workers and laborers working in factories. Factory registration is an obligatory certification required by all manufacturing units from their respective local state authorities.

Therefore, if you are a new startup or small factory owner venturing into the manufacturing sector of any kind, it is obligatory by law to comply with the Factory Act of 1948 and obtain a mandatory authorization to start manufacturing.

We at Professional Utilities can help you get your factory license online without any hassle or paperwork at competitive pricing.

What is Factory License?

Factory Registration Certificate or Factory License is an Authorization given to factories operating in their respective states. The objective of factory registration is to regulate the working conditions and safety of workers in the factory. Factory Registration is a very crucial authorization granted by local authorities in their respective states.

Documents Required For Factory License Certification

These are the List of Documents Required to attach during the filling with local authorities for Factory License Registration.

  • Directors or Partners
  • Owner’s ID and Identity Proof
  • PAN Card Details of Business
  • NOC From Water & Fire Department
  • Tax Receipt of Municipal Corporation
  • Address Proof of Factory such as utility bills
  • Partnership Deed or Board resolution as applicable
  • Information Regarding Equipments and Raw Material
  • Consent to establish & Operate From State Pollution Control Board

Process : How To Obtain Factory License Registration?

Step 1: Plan Submission

Owners of factories are required to submit their factory plan and local labor department, before the construction or expansion of the said factory. Applicants can only apply for Factory Registration after the authorization of factory plan

Step 2: Application & Documents

By clicking on the ‘Sign Up here’ option, the Registration purpose page will open. Select the ‘Registration Purpose page’ from the drop down box and click on ‘Submit’.

Step 3:Submission of Fee

Applicants are required to submit the govt fee during the submission of application with the authorities.

Step 4: Grant of License

The Factory License Registration will be granted after the inspection and complete verification by the local authorities. It would take around 30 working days to get factory registration authorization.

Eligibility For Obtaining Factory License

Criteria for Factory License Registration is classified into 2 categories

  • Factories having 10 or more workers with consumer power
  • Factories having 20 or more workers without consumer power

Factory License Cost : What is the Fee for Factory License?

The Professional fees For factory License starts from INR 49,999/- only. Thereafter applicants are also required to pay Govt fee for certification. The govt fee for factory license varies on the basis of eligibility criteria and their respective states.

Note: The aforementioned Fees is exclusive of GST.

Factory License Renewal : Overview

Factory License are valid for a time frame of 1–5 years. However, the renewal date of the factory license varies from state to state. However, the owners are required to apply prior to the due date in order to keep manufacturing going without any hindrance

Compliances After Factory License Certification

These are the following Statutory Compliances required to be fulfilled by the owner of the factory:

  • Health Provisions
  • Safety Provisions
  • Welfare Provisions
  • Working Hours of Adults
  • Annual Leave and Wages
  • Employment of Young Persons

Benefits of Factory License Registration

In India, a Factory License is a legal requirement under the Factories Act, 1948, for establishments engaged in manufacturing processes and certain other specified activities. Obtaining a Factory License offers several benefits to both the government and the business owner:

  • Legal Compliance: Obtaining a Factory License ensures that the business complies with the legal requirements outlined in the Factories Act. This helps in avoiding legal issues and penalties for non-compliance.
  • Safety and Health Standards: The Factories Act mandates certain safety and health standards for factories. Obtaining a Factory License ensures that the business adheres to these standards, providing a safe and healthy working environment for employees.
  • Regulatory Oversight: The issuance of a Factory License involves inspection and approval from the Factory Inspectorate. This regulatory oversight helps in maintaining and improving workplace conditions.
  • Employee Welfare: The Factories Act includes provisions related to working hours, leave policies, and welfare amenities for workers. By obtaining a Factory License, a business demonstrates its commitment to the welfare of its employees.
  • Insurance Coverage: Some insurance companies may require a valid Factory License as a prerequisite for providing insurance coverage to the factory. This can be crucial in mitigating financial risks associated with accidents or other unforeseen events.
  • Government Monitoring:A Factory License facilitates government monitoring of industrial activities. This is essential for planning and implementing policies related to industrial development, labor welfare, and environmental protection.
  • Access to Government Incentives:In some cases, having a valid Factory License may make the business eligible for government incentives, subsidies, or support programs aimed at promoting industrial growth and compliance with regulations.
  • Credibility:Possessing a Factory License enhances the credibility of the business. It signals to customers, suppliers, and other stakeholders that the business operates within the legal framework and is committed to maintaining high standards.
  • Environmental Compliance:Factories are often required to adhere to environmental norms. The Factory License process may include checks to ensure that the industrial activities do not adversely impact the environment, promoting sustainable and responsible business practices.
  • Facilitates Expansion:When a business plans to expand its manufacturing operations, having a valid Factory License is crucial. It streamlines the process of obtaining necessary approvals and permits for expansion.

Consent To Operate

Consent to Operate" refers to the formal approval or authorization granted by regulatory authorities to a business or entity allowing it to commence operations or continue existing ones. This consent is typically obtained after fulfilling certain legal and regulatory requirements, such as obtaining necessary permits, adhering to safety standards, and demonstrating compliance with environmental regulations. It signifies that the business has met the necessary criteria to operate within the specified jurisdiction and is committed to maintaining standards that safeguard the interests of stakeholders and the environment. Obtaining consent to operate is essential for ensuring lawful and sustainable business activities.

Consent To Operate | Manufacturing Compliance For Factory Owners

Consent to operate in India is an authorization given to factory owners who engage in any kind of manufacturing or production in the state. It is an important certification crucial for factory owners to get from their respective state pollution control board. Under the guidance of the water and air pollution act.

If the factory is covered under other pollution control acts such as e-waste, plastic waste then it is very important to factory owners to get consent from their respective boards in order to operate and fulfill their responsibility towards the environment. Usually Factories are categories under Red, Orange and Green Categories depending upon the kind of pollutants they release into the environment.

Note: However, factories under white category does not require to obtain a Consent to operate

Obtaining desired consent from India SPCB "State Pollution Control Board" is not an easy task at all. We at Professional Utilities can help you acquire your "Consent to operate certification" for your factory without any hassle in a brief time. Read further in the article to know more about the process and requirement for the SPCB consent certificate for factories in India.

What Is Factory Registration?

Factory Registration is certification required by MSME's involved in manufacturing in India The certification is provided by local authorities under factory act and rules 1948. Factory License is very important for an occupier or factory owner to commence their manufacturing as it regulates working conditions and safety of workers in a factory.

Government has laid down a few parameters and eligibility criteria for a factory owner to obtain a factory license in India.

As per the criteria the following types of factories are required to obtain a factory License.

  • Factories having 20 or above workers without power
  • Factories having 10 or more workers, working with power tools or machinery

Documents Required For Consent To Operate

  • Address of Factory
  • Layout Plan Showing Details of Manufacturing
  • Latest Analysis Report of Solid Waste and Other Pollutants
  • Copy of Balance Sheet Duly Attested by CA or CA Certificate
  • Details of Land in Case the Effluent is Discharged on Land or Percolation
  • Occupational Certificate Issued by Local Authorities Such as Municipal Corporation
  • MoA & AoA and Partnership Deed
  • Basic Details of Occupant

How To Get Consent To Operate For Factories?

Applicants are required to file for authorization to the state pollution control board. Consent will be given only after prior verification and completion of the due registration process.

Once the application form is duly completed, Applicants are required to attach valid documents to commence further process. With Professional Utilities, our team can cross verify and file applications on your behalf to make sure consent applications did not get rejected.

Once the application is submitted, it will be verified by authorities and re-examined by authorities for any discrepancy.

The Grant of Authorization or consent to operate is given to factories by the state pollution control board within 30 days of filing of an application.

Consent To Establish

A "Consent to Establish" is a formal approval granted by regulatory authorities, typically to businesses or individuals, allowing them to commence certain activities or projects that may have environmental or regulatory implications. This consent signifies that the proposed project complies with relevant laws, regulations, and environmental standards. It often involves an assessment of potential environmental impacts and measures to mitigate them. Essentially, it is a crucial step in ensuring responsible and lawful initiation of projects while safeguarding environmental and social interests.

Consent To Establish | Manufacturing Compliance For Factory Owners

Consent to Establish is an authorization given to factory owners who engage in any kind of manufacturing in Delhi. It is an important certification crucial for factory owners to get from the state pollution control board. Under the guidance of the water and air pollution act.

Factory owners must obtain consent from their respective boards to establish a factory and fulfill their environmental responsibilities if the factory is covered by other pollution control acts such as Extended Producers Responsibility or under any other pollution complience.

Factories that are classified into red, orange, and green categories based on the kind of pollutants they emit are required to obtain mandatory consent from Delhi state pollution control board. However, factories in the white category do not need to obtain a Consent Certificate

Obtaining desired consent from SPCB "State Pollution Control Board" is not an easy task at all. We at Professional Utilities can help you acquire your "Consent certificate" for your factory without any hassle, dwell more into the article to know more about the requirements and procedure for consent certifcate.

What is Factory License Registration

Factory Registration is certification required by MSME's involved in manufacturing in Delhi. The certification is provided by local authorities under the Factory Act and rules 1948. A factory license is very important for an occupier or factory owner to commence their manufacturing, as it regulates working conditions and safety of workers in a factory.

government has laid down parameters and eligibility criteria for a factory owner to obtain a factory license in Delhi.

As per the criteria, the following types of factories are required to obtain a factory license:.

  • Factories having 40 or more workers without power
  • Factories having 10 or more workers working with power tools or machinery

Documents Required for Consent to Establish

  • MOA /partnership Deed Respectively
  • Site Plan or Location Plan of the industry
  • Detailed Project Report which includes the details of raw material, product to be manufactured and other details in brief
  • Land documents such as registration deed/Lease deed
  • Details of Water Pollution Control/Air Pollution Control instruments

How to Get Consent to Establish for Factories

Applicants are required to file for authorization with state pollution control board. Consent will be given only after prior verification and completion of the due registration process.

Once the application form is duly completed, Applicants are required to attach valid documents to commence further process. With Professional Utilities, our team can cross verify and file applications on your behalf to make sure consent applications did not get rejected.

Once the application is submitted, it will be verified by authorities and re-examined by authorities for any discrepancy.

The Grant of Authorization or consent to operate is given to factories by the state pollution control board within 30 days of filing of an application.

A FinTech platform that understands your need

A comprehensive package of services for starting and managing your whole business, offered to you by a firm with a long-term goal to improve the way you do business.